Data Center Relocation & Migration

End-to-end physical relocation of data centre infrastructure — planned, executed, and verified by certified engineers across 190+ countries with zero unplanned downtime.

190+
Countries covered
0
Unplanned downtime target
10K+
Certified engineers
700+
Enterprise clients
What we deliver

What’s included in Data Center Relocation

🗺️

Migration Planning

Detailed move plan covering rack layouts, cable schedules, power requirements, and sequencing to minimise risk and downtime.

🖥️

Server & Network De-rack / Re-rack

Careful de-racking, labelling, and re-racking of servers, switches, storage, and networking gear by certified data centre engineers.

🚛

Secure Physical Transport

Specialist IT transport with anti-static packaging, GPS tracking, and chain-of-custody documentation from source to destination.

🔌

Cabling & Power Infrastructure

Structured cabling, power distribution, and cooling verification at the new facility — configured to your rack design and standards.

Post-Move Testing & Verification

Every system powered up, tested, and signed off before handover. Nothing goes live without engineer confirmation.

📋

Full Documentation

As-built rack diagrams, asset registers, cable schedules, and sign-off reports delivered at project close.

Why IP Global

Why enterprises choose us

01

Zero unplanned downtime

Our engineers plan every move with contingency. We don’t go live until every system is verified and tested.

02

Truly global execution

Source and destination in different countries? No problem. We have certified engineers at both ends and handle all logistics between them.

03

Single point of accountability

One project manager owns the move from first survey to final sign-off. You always know who to call.

04

Full asset continuity

Every asset tracked from de-rack to re-rack with serial-level documentation. Nothing gets lost or misconnected.

How it works

Simple. Safe. Global.

01

Site survey

We survey source and destination facilities, document assets, and design the move plan.

02

Plan & schedule

Move sequence, transport logistics, and rollback plan agreed with your team before work begins.

03

Execute the move

Engineers de-rack, transport, re-rack, cable, and power up — all to the agreed plan and timeline.

04

Test & hand over

Full system testing and sign-off. As-built documentation delivered to your team.